You are putting up a shop, an office, a storefront, or a yard for your crews, and your lot is somewhere on the Calhoun County flood map. A house on that lot has to sit above the base flood elevation. A commercial building has a second option, and it is usually the cheaper one.
NTEX Construction builds commercial space in Port Lavaca and across Calhoun County, out of our shop 46 miles northwest in Goliad. Family owned and operated, so an owner answers the phone and an owner runs your job. Call (361) 645-4000 and tell us what you are building. For a house rather than a commercial building, start with new home construction in Port Lavaca.
Retail on the ground floor, offices or a unit upstairs.
Not sure which bucket you fall in? Call. We will tell you straight if it is our kind of job.
Hurricane season runs June through November, and the back half of it is the part that matters here.
So we sequence the job around it. Dry-in is the milestone we chase, and on a build that starts in spring we push to have the roof on and the envelope closed before the water in the Gulf gets warm. When a job has to run through the fall, we stage materials so nothing expensive is sitting in an open bay waiting on a delivery truck.
The other half of the schedule is your doors. A store shut down for a remodel is a store making nothing. Sometimes we phase the work so half your floor stays open, sometimes we work nights, and sometimes we stack the loud, dusty part into one short window instead of letting it drag across a month.
Tell us what you cannot afford to shut down, and what you cannot afford to have open in October. We build the schedule around both.
Inside the city limits, plans go to Development Services at 202 North Virginia, phone 361-552-9793. Out on county land, Calhoun County handles the floodplain permit and the septic system. Either way, the state has two things to say about a commercial building.
A commercial permit application needs the signed form, plans submitted digitally along with printed labeled sets, and a contractor already registered with the City of Port Lavaca. We carry the registration, so that is one less thing waiting on you.
In an AE zone a non-residential building can be made watertight below the base flood elevation instead of elevated, which keeps your floor at grade and your loading dock usable. It takes a floodproofing certificate signed by an engineer. In a VE zone that option goes away and the building goes up on an open foundation.
Calhoun County sits in the state windstorm catastrophe area, so a commercial building needs the same Certificate of Compliance a house does before a carrier will write wind and hail on it. The application goes in before work starts, and the inspector sees the fasteners and connections while they are still open.
Cross $50,000 in construction cost anywhere in Texas and the project goes to the Department of Licensing and Regulation, gets a plan review by a registered accessibility specialist, and gets inspected once it is built. The fee to register is $175.
Calhoun County is flat and drains poorly. Loam on the surface, cracking clay underneath, and through the cool season the water sits close enough to grade to matter.
A commercial slab feels that more than a house does. You are asking it to hold racking, a forklift, a delivery truck at the dock, or forty parking spaces, and clay that swells and shrinks will find the weak spot. Ground that drains slowly also decides where your parking lot sends water after a four-inch rain, and whether that water leaves the site or stands against your building.
We start with the dirt. Soil work first, a slab and pavement section engineered for the loads you actually put on them, and a drainage plan drawn before anybody pours.
A lot of commercial work in Calhoun County is metal. Shops, storage, small warehouses, and yard buildings.
A metal building ordered out of a catalog for a site in Central Texas will not last the same number of years three miles from Lavaca Bay. Salt air gets into fasteners, flashing, door tracks, and anywhere two dissimilar metals touch. We spec coastal-grade coatings, the right fasteners, and details that let the building shed water instead of holding it.
Then there is the wind. The frame, the anchor bolts, and the sheeting screws all have to hold the numbers the windstorm inspector is checking for, and a building that was never engineered for this coast will not pass.
We do the whole thing. Slab, anchor bolts, erection, doors, insulation, and the interior if you want office space inside it.
Whether you have questions, would like a quote, or are ready to start your project, submit the form or call us at (361) 317-7385 to get in contact with us.